Diving Equipment, Breathing Apparatus Components and Associated Accessories
Scope Summary
The Department of National Defence has a requirement for the items detailed below. The delivery is requested at CFB 12 Wing Shearwater and CFB Esquimalt. This procurement for DIVING, MISCELLANEOUS EQUIPMENT (GENERIC) (FDU CLASS SHIPS), as detailed in the Annex Statement of Requirements: Line Item: 001 STRAP,ELASTIC Part Number:621132 NCAGE:94120, AQUALUNG USA, INC Quantity: 50 UoI: EA to be delivered to: CFB 12 Wing Shearwater Line Item: 002 STRAP,ELASTIC Part Number:621132NCAGE:94120, AQUALUNG USA, INC Quantity: 50 UoI: EA to be delivered to: CFB Esquimalt Line Item: 003 KNIFE,DIVER'S Part Number: KN200NCAGE: 3YMV0,XS SCUBA INC Quantity: 60 UoI: EA to be delivered to: CFB 12 Wing Shearwater Line Item: 004 KNIFE,DIVER'S Part Number: KN200 NCAGE:3YMV0, XS SCUBA INC 4820 Quantity: 60 UoI: EA to be delivered to: CFB Esquimalt Line Item: 005 KNIFE DIVER Part Number:0655-011 NCAGE: S3410, POSEIDON DIVING SYSTEMS AB Quantity: 20 UoI: EA to be delivered to: CFB 12 Wing Shearwater Line Item: 006 KNIFE DIVER Part Number:0655-011 NCAGE: S3410, POSEIDON DIVING SYSTEMS AB Quantity: 20 UoI: EA to be delivered to: CFB Esquimalt Line Item: 007 SWIM FINS Part Number:
Bid Readiness Checklist
-
1. Portal Registration & Eligibility MandatoryConfirm active supplier account on the issuing portal to submit bids to buyer "Department of National Defence (DND)" (Canada).Suggested Evidence: SAP Ariba Supplier ID / Procurement Business Number (PBN)
-
2. Submission Deadline & Format MandatoryFinalize pricing and compliance attachments at least 24 hours ahead of Closes 2026-11-19 · 5 days left 14:00 ET.Suggested Evidence: Signed Cover Form, Mandatory Returnables & Complete File Upload
-
3. Technical Specs, Lead Times & Warranty MandatoryConfirm OEM/equivalent part compliance, delivery lead times, OEM authorization, and post-delivery warranty coverage.Suggested Evidence: Spec Sheet, OEM Authorization & Lead-Time Schedule
-
4. Commercial Pricing Schedule MandatoryStructure transparent itemized fixed or T&M rate pricing aligned with notice deliverables (ceiling not disclosed in notice).Suggested Evidence: Itemized Pricing Table, Rate Card & Scope Assumptions